HELLBENDER power-system instance generator · v0.4 prototype
TEST INSTANCES
OʻAHU 37-BUSsmall · HECO island system · 1.2 GW peak
ERCOT ~2.4k-BUSlarge · Texas interconnection · 85 GW peak
MISO+SPP 24k · requires Hellbender batch node
CLIMATE 2026-09-01
HOUR 19:00

System cost

$/MWh SERVED · SYSTEM LEVELIZED
Hourly operating cost
Daily cost (24 h)
vs. baseline case

Energy balance

Total demandMW
Data-center demandMW
Generation dispatchedMW
CurtailedMW
UnservedMW
Firm reserve margin%
Renewable share%
CO₂ emissionst/h

Dispatch by resource

Network state

Buses / branches
Max branch loading%
Branches > 90 %
Losses (DC approx.)MW
Slack imbalanceMW
DC power flow, 37 buses / 48 branches, solved per hour. Hellbender allocation: 1 node × 24 h-blocks in parallel.
0 BUSES →
MW/BUS
drag a box over buses → assign a generation type on the right. shift-drag adds to selection · middle-drag pans · esc clears
GENERATION TYPE
MARKER
radius ∝ installed MW
square = data-center bus

24-hour dispatch stack · MW

Constraint violations

BUILDING CASE · SOLVING DC POWER FLOW …